picontrolsolutions  
 
home service_offering what_we_bring our_edge experience about_us contact_us
 
BUSINESS UNITS
Process Engineering
Process Controls
APC & MPC
Optimization
DCS/PLC/HMI
Modeling
Data Analysis
ERP
Programming
Environmental Monitoring
 
INDUSTRIES SERVED
Alcohol
Air Separation
Polymers
Specialty Chemicals
Petrochemicals
Refining
Power Plants
Oil & Gas upstream
Pharmaceuticals
Gasification
Cement
BUSINESS UNITS: OPTIMIZATION

This is another core service where we stand above our competition.

We believe that unit based optimization is more powerful, more robust, easier to understand and implement and less costly than plant wide optimization.

We have developed several proprietary methods of optimizing each facility unit taking into account all the parameters that can affect the profit margin. We will incorporate these optimization solutions into the advanced controls schemes.

We provide several on-line calculations that demonstrate the performance of the unit. Once trended, these values can be used to pinpoint areas where the plant performed above or below expectation and analysis could be made to find out the root cause. This tool has been very successful in the past and has been very beneficial to our clients.

We provide both open-loop and closed-loop solutions. An example of where we have implemented a closed loop solution is where we have calculations that will reduce the profitability of a particular product once there is reduced demand or once the tank(s) is/are full. A closed-loop solution will then optimize production of the other products at the expense of the undesired product.

Here is an example where we implemented an open-loop solution in an Air separation plant where we had just installed Model Predictive Contols (MPC). Upon analyzing the data, we discovered that two weeks after implementing MPC, our profit margin had taken a dive from about $260/hr profit to about $63/hr. We made an inquiry and found out that the Liquifier warm turbine was leaking and some Main Air Compressor (MAC) coolers/chillers were not functioning properly. A quick calculation showed that at the average Air flowrate, the plant was loosing about $5,000 per day. The problem was escalated and resolved in 2 day. The problem had existed for a little over two weeks prior. Had the plant personnel made it a priority to utilize our tool earlier, they would have saved about $75,000 because they eventually had to repair the problem and customer demand was high. Many of these problems exist today and need immediate attention. This is where we thrive and enjoy bringing solutions to such complex issues.

Our solutions help point out the most optimal conditions to run the process at every instance by calculating the instantaneous profit margins.

We will not only implement these solutions but will like to work with you in analyzing the data be it daily, weekly or monthly. It is easy to transfer data these days. Artcon has the will capability of analyzing your plant data and recommending solutions without setting foot at the site. Artcon Engineers will come to the plant only to install the solution saving you time and money.
 
SENSYS
HOUSTON COMMUNITY COLLEGE
SAYPLANT
VISTA-CONTROL
AMRIT CONSULTING
 
vle_distillation process_controls
 
© Copyright artcon.com. All rights reserved. To request more information, please send an email request to contact@artcon.com